Skip to main content

Search form

Step 11. User training.

Project management: Post order phase

What is the purpose of the user training?

  • To enable the users of the timeware® system to operate the product as efficiently as possible. The training covers all aspects of daily use.

Points to remember when arranging the user training?

  • The details of the user training will be included in the Pre-installation report, Code t2-0518.

Which members of the timeware® team should attend the user training?

  • A member of the implementation team, usually the same person that completed the project commissioning.

What is the dress code for user training?

  • Smart office.

  • White shirt with timeware® tie.

  • Polished shoes.

Where can the user training take place?

  • Customer’s offices.

  • Remotely using remote presentation software.

What documents are required for the user training?

  • Word Document Download
    Pre-installation report
    Pre-installation report
    Code: t2-0518
     
  • PDF Document Download
    Training Guide
    Training guide: timeware® overview and key functions
    Code: t2-0732
     
  • PDF Document Download
    Training Guide
    Training guide: Basic Personnel
    Code: t2-0750
     
  • PDF Document Download
    Training Guide
    Training guide: Absence Management
    Code: t2-0755
     
  • PDF Document Download
    Training Guide
    Training guide: Attendance
    Code: t2-0760
     
  • PDF Document Download
    Training Guide
    Training guide: Access Control
    Code: t2-0765
     
  • PDF Document Download
    Training Guide
    Training guide: Reports and Exports
    Code: t2-0790
     
  • PDF Document Download
    The timeware® Professional training candidates’ names form
    The timeware® Professional training candidates’ names form
    Code: t2-0530
     

What equipment is required for the user training?

Following the user training.

  • The timeware® team member prepares a user training day-report which is passed to the projects team.